Aluminium and FRP systems for window and door fabrication

B2B supply for window fabricators

FRP window profiles and glass-free CKD kits.

PINDÉ supplies qualified FRP window-system materials to manufacturers, importers and project fabricators. The scope can stop at long profiles, include cut-to-length machining, or reach an opening-by-opening CKD kit without insulating glass. Final glazing, assembly, conformity and installation can remain in the destination market.

This is a B2B profile and fabrication-system offer, not an installed retail-window service. A project starts from the target system, window schedule, factory capability and destination requirements.

Choose the fabrication responsibility split.

The three formats use the same released reference build. They differ in which cutting, machining and kit-preparation operations are completed in Chongqing.

P1FRP

FRP system profile kit

From PINDÉ
Pultruded frame, sash, mullion and bead profiles with seals, joints, connectors, BOM and fabrication documents.
Kept local
Cutting, drilling, bonding, fastening, hardware, glazing, final QA and installation.
Typical fit
An established fabricator with qualified composite-profile tooling and process control.
P2FRP

Cut and machined FRP profiles

From PINDÉ
Cutting-list optimisation, cut-to-length parts, drainage, hardware machining, corner preparation and part identification.
Kept local
Corner joining, seals, hardware, glazing, adjustment, finished-unit testing and installation.
Typical fit
A factory introducing FRP while retaining window assembly and glazing locally.
P3FRP

Glass-free FRP CKD kit

From PINDÉ
Machined parts packed by opening with seals, approved joints, agreed hardware and replacement items.
Kept local
Incoming inspection, final assembly, locally sourced insulating glass, conformity, commissioning and site work.
Typical fit
A paid pilot of 3–10 units, a scheduled project or a cell with limited profile machining.

Release a system before repeat supply.

A profile is only one part of an operable window. PINDÉ therefore qualifies the system, manufacturing process and evidence together before repeat orders.

1. System fit

Review opening types, glass, loads, climate, target performance and factory equipment.

2. Reference build

Freeze profile sections, BOM, joints, seals, hardware interfaces and drawing revision.

3. Paid pilot

Inspect sections and corner specimens, then fabricate and test a typical 3–10 glass-free-kit batch.

4. Repeat release

Review yield, dimensions, packing, assembly time and closure of non-conformities before scale-up.

Inputs required for an FRP profile quotation.

  • Window and door schedule with size, quantity and opening type
  • Glass build-up, spacer, hardware preference and colour
  • Target Uw, wind, air, water, acoustic and design-temperature requirements
  • Factory saws, drills, dust extraction, joining and glazing capability
  • Preferred P1, P2 or P3 scope, annual volume and pilot timing
  • Destination country, project location, delivery term and local conformity party

Frequently asked questions.

Does PINDÉ sell FRP window profiles without finished glass?

Yes. P1 supplies system materials, P2 adds cutting and machining, and P3 supplies an opening-by-opening glass-free CKD kit. The exact scope is fixed in the quotation and BOM.

What is the minimum order for an FRP window system?

A new programme normally starts with profile and corner samples followed by a paid pilot of about 3–10 glass-free units. Repeat-order quantities are set after the pilot and packing review rather than claimed as one universal MOQ.

Can insulating glass be sourced in the destination market?

Yes. Local glazing can reduce transport risk and align the unit with local glass requirements, provided the build matches the released thickness, weight, edge and thermal specification.

How is FRP window-profile pricing prepared?

Pricing uses the profile kg or metres, opening schedule, machining, joints, seals, hardware scope, packing, test work and delivery term. A drawing or schedule is required for a comparable quotation.

Ready to define the first FRP profile or CKD batch?

Send the schedule and factory capability