Aluminium and FRP systems for window and door fabrication
Technical RFQ

Send the opening schedule and equipment list.

State which operations your factory performs and which parts must arrive ready from Chongqing. The technical reply will list missing data, a proposed pilot format and the documents used for the quotation.

What to prepare

  • Destination market and target standard
  • System, supply format and estimated volume
  • Window schedule, BOM or drawings when available

Technical review target: within 2 business days

inquiry@pindesys.com
Engineering qualification

Technical quotation details

Opening schedule / BOM / drawings