Aluminium and FRP systems for window and door fabrication
B2BFor manufacturers and project procurement

Chongqing · Window system supply · Eurasia

Window and door systems prepared for your production line.

PINDÉ supplies aluminium and FRP profile systems, machined parts and glass-free CKD kits to fabricators in Russia and Central Asia. The opening schedule and available machinery determine how far the parts are prepared in Chongqing.

Business-to-business supply. Insulating glass units, final assembly, destination-market conformity and installation normally remain local.

PINDÉ integrated manufacturing base in Chongqing, China
Manufacturing baseChongqing · China
100,000 m²
Direct system supply

Production-ready scope

AL

Aluminium systems

Thermally broken profiles · components · bill of materials

01
FRP

Composite systems

Pultruded profiles · qualified joints · fabrication pack

02
CKD

Machined kits

Cut · machined · labelled · packed by opening

03

Chongqing · China / Russian-speaking markets

100,000 m²Integrated manufacturing base
P1—P3Three supply-readiness levels
2 daysTechnical RFQ review target
6 marketsRussian-speaking market focus
Built for
Window manufacturersProfile-system fabricatorsImporters & regional stockistsProject procurement teams
Two material families

Select the construction before choosing the supply format.

The technical offer identifies the profile set, gaskets, connectors, hardware interfaces and fabrication documents for the selected construction. Local responsibilities are recorded in the same revision.

Supply status

Regular production range

01

System scope

Thermally broken aluminium window-and-door systems

Exterior window and door systems use aluminium profiles with polyamide thermal barriers. Interior sliding and folding systems are listed separately. Supply can stop at finished profile lengths or include project-specific cutting, machining and kit preparation.

Included in the launch package

  • Frame, sash or door-leaf, mullion and glazing-bead profiles
  • Polyamide barriers, EPDM gaskets, cleats and connectors
  • Drainage parts, hardware schedule and bill of materials
  • Machining drawings, assembly instructions and spare-parts list

For buyers searching aluminium window profiles wholesale, thermally broken window systems or profiles for aluminium window production.

Supply status

Project-qualified range

02

System scope

FRP / glass-fibre composite window profile systems

Full-FRP and aluminium-composite systems are released from a defined reference build. The joint method, adhesive or fasteners, processing controls and test plan belong to that system and are not transferred from another composite product.

Included in the launch package

  • Frame, sash, mullion and glazing-bead profile set
  • Qualified corner joints, gaskets and fastening interfaces
  • Cutting, drilling, bonding and dust-control parameters
  • Pilot kits, first-article inspection and fabrication training

For qualified searches around FRP window profiles, glass-fibre composite window systems and pultruded profiles for window fabrication.

A thermal, structural or weather value is quoted with the specimen, insulating-glass make-up and report scope. A different construction keeps the value as a project requirement until it is verified.
Chongqing rail connection

Rail dispatch from Chongqing to Central Asia and Russia.

Chongqing's international rail network serves hubs in Kazakhstan and onward routes across Central Asia and Russia. A planning range of roughly 7–20 days may be used for the rail leg in a current quotation, but the booked service, border transfer, customs and last mile determine the actual delivery date.

Origin and production dispatch
Chongqing
Rail hubs and onward regional routes
Central Asia
Planning range for the rail leg only
~7–20 days
Yuxinou railway freight route map from Chongqing to Kazakhstan, Uzbekistan, Turkmenistan, Tajikistan, Kyrgyzstan and Russia
Yuxinou freight route from Chongqing to Central Asia and RussiaOpen full route map

Transit times are indicative, not guaranteed. Actual timing depends on train schedules, consolidation, customs clearance, destination and last-mile arrangements; freight is confirmed for each shipment.

Supply formats

Choose how much processing stays in Chongqing.

P1, P2 and P3 distribute cutting, machining and kit preparation between PINDÉ and the local fabricator. Quotations separate profiles, processing, components, packing and freight.

Supply responsibility matrix
P1Material supply

System material kit

From Chongqing
Finished profiles, gaskets, cleats, connectors, drainage parts, bill of materials and fabrication documents.
Kept local
Cutting, machining, hardware, glazing, assembly, QA and installation.
Typical buyer
A fabricator with cutting, machining and corner-joining equipment.
P2Machined supply

Cut-to-length and machined profiles

From Chongqing
Cutting-list optimisation, drainage and lock machining, CNC work and part identification.
Kept local
Corner joining, hardware, glazing, adjustment, final inspection and installation.
Typical buyer
A factory introducing a system or moving selected machining work upstream.
P3Opening-by-opening

Glass-free CKD kit

From Chongqing
Machined profiles packed by opening with seals, joints, selected hardware and a spares pack.
Kept local
Final dimensional check, assembly, insulating glass units, adjustment, conformity work and installation.
Typical buyer
A paid pilot, scheduled project or production cell with limited machining capacity.
Production launch

Four decisions before repeat supply.

Qualification → pilot → repeat supply

0101/04

Qualify the system

Review the equipment list, expected volume, current systems, opening schedule, glazing and destination requirements.

0202/04

Freeze the reference build

Agree the system code, representative sizes, bill of materials, joints, evidence and responsibility split.

0303/04

Run a paid pilot

Inspect profile sections and corner joints, then assemble and test a typical 3–10 glass-free kit pilot.

0404/04

Scale by evidence

Review yield, fit, packing, delivery and closed non-conformities before a project batch or repeat order.

Responsibility split

Prepared parts from Chongqing, finished units near the project.

PINDÉ · Chongqing

Prepared in Chongqing
  • System definition and bill-of-materials control
  • Profile production, finishing and batch QA
  • Optional cutting, CNC machining and kit identification
  • Packing, documentation and replacement parts

Local fabricator · Destination market

Local fabrication
  • Final opening and unit-dimension confirmation
  • Locally sourced glazing and approved hardware
  • Assembly, adjustment and finished-unit inspection
  • National conformity, installation and first-line service

Rail-compatible export packing from Chongqing. FCA, CIP and DAP options are quoted per shipment; freight and import charges are never presented as fixed long-term rates.

Technical release

Production documents tied to the approved construction.

Technical package

System definition

Profile sections, mass per metre, bill of materials, colour and batch rules, plus gasket and connector maps.

Fabrication package

Cutting and machining drawings, drainage, joint method, tooling, process parameters and inspection points.

Evidence register

Report number, laboratory, specimen size, insulating-glass make-up, hardware, date and stated scope.

Launch support

Samples, first-article review, remote training, issue log, change control and replacement-part planning.

Cold-region performance is checked for the finished construction. Frame depth, thermal-barrier width and material conductivity do not establish whole-window performance on their own.

Important before import

Country-specific conformity

Confirm the route for the product and destination.

The importer and a local conformity body determine the applicable standard, applicant, specimen and marking. P1 material kits, P2 machined parts, P3 CKD kits and finished units may not share the same customs or conformity scope.

PINDÉ integrated manufacturing base in Chongqing, China
Manufacturing base · Chongqing, China

One 100,000 m² site for profiles, finishing, machining and system assembly.

The factory area describes the manufacturing base, not the capacity reserved for an order. Equipment, inspection points, packing method and available monthly output are confirmed for the selected system during qualification.

100,000 m²integrated base
Chongqingproduction and dispatch
P1—P3supply configurations
Procurement questions

Before you request a quote.

01Do you ship complete glazed windows for retail projects?+

Normally no. The regular scope is a system material kit, machined profiles or a glass-free CKD kit. Insulating glass units, final assembly, destination-market assessment and installation remain local. A finished sample may be quoted for testing or training when its size and purpose are agreed.

02Can aluminium and FRP be included in the same enquiry?+

Yes. They remain separate lines with their own bill of materials, processing method, evidence register and inspection plan. Sharing a container does not make the constructions or their performance evidence interchangeable.

03What do you need for a technical quotation?+

Send the destination city, company role, expected volume, equipment list, opening schedule or drawings, glazing concept, required finish, target standard and preferred supply format. PDF, DWG, DXF, spreadsheet and ZIP attachments are accepted.

04How are samples and pilot orders handled?+

The normal sequence is profile sections, corner-joint specimens and then a paid pilot of 3–10 glass-free kits. Any credit for sample or freight cost is written into the quotation.

05Can one generic EAC document cover every shipment?+

It should not be assumed. The importer and appointed local body check the actual goods, intended use, destination and applicable technical regulation or national standard. The applicant and specimen scope are agreed before shipment.

06Which commercial terms are available?+

Initial quotations can be structured on FCA, CIP or DAP terms, with freight, duty and tax shown separately. New accounts start with prepayment; credit terms are considered only after successful repeat business.