Window-system materials and semi-finished kits from Chongqing

A controlled route from drawing to repeat supply..

Four steps from first contact to regular shipments. Every step produces verifiable deliverables — not sales promises. Qualification → pilot → repeat supply.

0101/04

Qualify the system

We review your equipment list, annual volume, current window systems, typical window schedule, glazing specifications, and target-country requirements. This tells us which system and supply format fits your operation — before any quotation.

0202/04

Freeze the reference build

We agree on: system code, representative sizes, complete BOM, mechanical interfaces, available performance evidence, and a responsibility matrix (what Chongqing supplies vs what your factory does). This becomes the contract baseline.

0303/04

Run a paid pilot

Start with profile section samples and corner joint specimens for your team to inspect. Then 3–10 glass-free kits for your factory to fabricate, assemble, and test locally. Sample and freight costs can be credited against an agreed first purchase threshold.

0404/04

Scale by evidence

Move through micro-batch → project batch → repeat programme. Each stage gates on yield data, fit consistency, logistics performance, and claims resolution. No volume commitment until the evidence supports it.

Ready to qualify your factory?

Start the qualification process